Skip to content

ALDOT News Hub

How ALDOT's Aeronautics bureau supports Alabama airports

The ALDOT Aeronautics bureau grant program does more than distribute funds, it carefully coordinates a process that helps Alabama’s airports grow and meet the needs of their local communities.

At the heart of this effort is the annual airport funding cycle. Developed with input from the Federal Aviation Administration (FAA), airport directors and engineering consultants,...

Read More "How ALDOT’s Aeronautics bureau supports Alabama airports"

An Alabama Department of Transportation (ALDOT) resurfacing project on SR-223 in Pike County begins Monday, July 28, weather permitting.

The project will take place on SR-223 from US-29 to the Bullock County line.

This project includes resurfacing, shoulder widening and traffic stripe.    

Motorists should expect lane closures and reduced speed limits throughout the project….

Read More “SR-223 resurfacing project in Pike County begins next Monday”

Resurfacing of SR-133/Cox Creek Parkway will begin Sunday night. The project includes resurfacing through multiple intersections, including the intersection with Darby Drive.

Resurfacing of SR-133/Cox Creek Parkway in Florence will begin the evening of Sunday, July 27, weather permitting.

In the $1.4 million project, contractor Rogers Group will mill and resurface more than two miles of the corridor from US-72/Florence Boulevard to SR-17/Helton Drive.

Initial work will include milling at intersections, installing signal detection loops, and patching.

Read More “Resurfacing of SR-133/Cox Creek Parkway in Florence to start Sunday night”

ALDOT workers repair a damaged rail on the flyover bridge at I-65 and I-565.

ALDOT is making final repairs to the damaged flyover bridge at the I-65 and I-565 interchange today.

A steel coil fell from a truck Tuesday and damaged the bridge and ramp from I-565 westbound to I-65 southbound.

Yesterday, ALDOT crews milled and paved to repair the asphalt roadway of the ramp, then began preparations…

Read More “ALDOT making final repairs to damaged I-65 ramp bridge today”

Contractors raised the Upper River Road bridge over I-65 by jacking it and inserting metal shims, which will be encased in concrete.

The Parker Road bridge over I-65 near Hartselle is scheduled to close Thursday, July 24, at noon as part of a project to raise the bridge structure.

Crews will elevate the bridge 13 inches to achieve a 17-foot clearance over I-65. The closure is expected to last about six weeks, and motorists should use alternate…

Read More “Parker Road bridge over I-65 to close Thursday at noon”

Popular Stories