The Alabama Department of Transportation (ALDOT) will close the second lane from the right on I-65 south on the Alabama River Bridge on Thursday, Sept. 17, weather permitting.
The lane closure will begin at approximately 8 p.m. to allow crews to safely perform necessary bridge deck repairs. The two left lanes on I-65 south and the on ramp from Northern Boulevard (SR-152) will remain open.
ALDOT urges drivers to plan accordingly for possible delays and be mindful of people and equipment in the work zone.
For real time traffic updates and more, download the ALGOTraffic app or visit ALGOTraffic.com.


