Skip to content
ALDOT News Hub
ALDOT reminds drivers to know the total height of their vehicle and load, obey posted clearance signs and never rely solely on navigation apps. Check Your Height. Know It’s Right.

The Alabama Department of Transportation is reminding drivers that knowing the height of their vehicle can prevent crashes, traffic delays and costly damage to bridges and tunnels.

During Bridge Strike Awareness Week, ALDOT will promote the “Check Your Height, Know It’s Right” campaign. The campaign encourages drivers to confirm that their vehicles and loads can…

Read More “ALDOT announces Bridge Strike Awareness Week”

An Alabama Department of Transportation (ALDOT) resurfacing project on US-84 in Enterprise begins Monday, July 27, weather permitting.

The project will take place on US-84 from SR-167 to the Dale County line.

The project includes resurfacing, placing a high-density mineral bond and traffic striping.

A high-density mineral bond is a pavement preservation treatment used to…

Read More “Resurfacing project on US-84 in Enterprise begins Monday”

An Alabama Department of Transportation (ALDOT) resurfacing project on SR-27 in Enterprise begins Monday, July 27, weather permitting.

The project will take place on SR-27 inside the Boll Weevil Circle.

Motorists should expect lane closures and reduced speed limits throughout the project. ALDOT urges drivers to plan accordingly and remain cautious around people and equipment…

Read More “Resurfacing project on SR-27 in Enterprise begins Monday”

An Alabama Department of Transportation (ALDOT) resurfacing project on US-331 in Highland Home begins Monday, July 27, weather permitting.

The project will take place on US-331 from Ronalds Road to the Montgomery County line.  

The project includes resurfacing and traffic striping and placing a high-density mineral bond on the paved shoulder.

A high-density mineral…

Read More “Resurfacing project on US-331 in Highland Home begins Monday”

An Alabama Department of Transportation (ALDOT) project to rehabilitate the bridge deck over the Choctawhatchee River on US-231 in Newton begins Monday, July 27, weather permitting.

The contractor will utilize hydroblasting, a method known for its efficiency, safety, and precision, to restore the bridge’s roadway.

The bridge will remain open during the rehabilitation, and traffic…

Read More “Bridge rehabilitation on US-231 in Newton begins Monday”

An Alabama Department of Transportation (ALDOT) project on SR-293 (Milly Creek Lane) in Pike Road begins Monday, July 20, weather permitting.

The project will take place on SR-293 from SR-126 to SR-110 (Vaughn Road).    

This project includes micro-surfacing, guardrail installation, and traffic striping.

ALDOT uses micro-surfacing, a protective, preventative treatment, to extend a road’s…

Read More “Resurfacing project on SR-293 in Pike Road begins Monday”

The Alabama Department of Transportation (ALDOT) has added intersection modifications to US-431 and SR-165 in Phenix City to the ongoing resurfacing project.

The resurfacing project on US-431 began in June and includes resurfacing, guardrail installation, and traffic striping on US-431 from Freeman Road to US-280.

The intersection modifications include:

Installation of an additional left turn…Read More “Intersection modifications coming to US-431/SR-165 in Phenix City”

An Alabama Department of Transportation (ALDOT) resurfacing project on US-84 in Dothan and Cowarts begins Monday, July 13, weather permitting. 

This project includes resurfacing and traffic striping on US-84. Work spans from US-431 to Health Sciences Boulevard in Dothan and from Jester Street to Broad Street in Cowarts.

ALDOT advises drivers to plan for potential…

Read More “US-84 resurfacing project in Dothan and Cowarts begins Monday”