Skip to content
ALDOT News Hub
Widening of I-59/20 near Fairfield is scheduled to begin by the end of 2027.

The Alabama Department of Transportation (ALDOT) is proposing to widen I-59/20 between Hueytown and Fairfield.

The two-mile job adding a lane in each direction would stretch from Valley Road to Fairfield Boulevard.

The work would also include replacing two bridges at Aaron Aronov Drive and Valley Road.  

Each day, about 70,000 vehicles travel this…

Read More “Public comment period is open for future I-59/20 widening project near Fairfield”

Two-mile stretch of I-59/20 is being resurfaced between Fairfield and Hueytown.

An Alabama Department of Transportation (ALDOT) resurfacing project to replace an aging section of I-59/20 near Fairfield began Sunday, Feb. 8.

The project will replace two miles of deteriorating asphalt between the Fairfield Boulevard and Valley Road bridges.

More than 60,000 vehicles pass through that section of interstate daily.

Several asphalt patches on I-59/20 between…Read More “ALDOT resurfacing I-59/20 between Fairfield and Hueytown”