Beginning at 7 p.m. on July 27, weather permitting, the Alabama Department of Transportation (ALDOT) will close the right lane of US-280 westbound for widening between Milepost 1.39 and Milepost 4.51.
All travel lanes are expected to re-open at approximately 6 a.m. on Monday, July 28.
These same lane closures will be in place from 7 p.m. to 6 a.m. on Monday, July 28, through Friday August 1.
Motorists are requested to consider using alternate routes, adjust arrival/departure times, observe work zone speed limits and other work zone signs, and use extreme caution in this area.
ALDOT thanks motorists for their patience during this Construction Operation to improve Alabama’s roadways.
ALDOT’s mission is to provide a safe, efficient, environmentally sound transportation network across Alabama. For further information, visit www.dot.state.al.us.