Skip to content
ALDOT News Hub

Travel advisory for I-65 bridge replacement over Sepulga River

Sepulga River bridge replacement over I-65
Sepulga River bridge replacement over I-65
Mar 25

As work continues on the I-65 bridge replacement project in Conecuh County, drivers should expect to see reduced speed limits. Motorists should also expect possible daily left lane closures in each direction between March 25 and March 28 from approximately 7 a.m. until 5 p.m.

Motorist should stay alert and watch for construction vehicles entering the roadway from the median work zone.

The affected area is from approximately milepost 103.5 to milepost 106.5.

Visit ALGOtraffic.com or download the ALGO Traffic app for real-time traffic and road condition information and to subscribe to personalized traveler alerts.

Related Project