Skip to content
ALDOT News Hub
Demolition of the I-65 South rest area in Greenville.

On Tuesday, May 28, the contractor began the demolition of the I-65 South rest area in Greenville.

Once the demolition is complete the contractor will begin clearing debris and preparing to build the larger, updated rest area. 

Visit ALGOtraffic.com or download the ALGO Traffic app for real-time traffic and road condition information and to subscribe to…

Read More “Demolition of I-65 South rest area in Greenville begins”

Drivers will soon see a center turn lane added to US-31 in Baldwin County

ALDOT announces the start of construction for the widening of US-31 in Baldwin County to add a center turn lane for motorists. The addition of a center turn lane in this segment of US-31 will improve traffic flow and safety by providing a dedicated lane for vehicles turning into businesses or side streets along the…

Read More “Work begins on center turn lane addition to US-31 in Baldwin County”

Terence Williamson, left, and his teammate pose with the 2020 Grand National Calling Championship trophy

There’s never any question about who’s providing the turkey on Thanksgiving at Terence Williamson’s house.

Some things just don’t need questioning.

The flexibility to do stuff outside of work and have a work-life balance was important to me. ALDOT is a great place to work because of that and I honestly love working here.

Terence…Read More “Terence Williamson: balancing engineering and turkey calling championships”

Motorists are now traveling toll-free on the Beach Express Bridge following the removal of the toll at noon on May 23.

ALDOT urges all drivers using the Beach Express Bridge to remain aware of reduced speed limits of 15 mph as they approach the plaza structure. With the Memorial Day holiday weekend in full swing,…

Read More “Motorists travel toll-free on Baldwin Beach Express Bridge following toll removal”

Motorists are traveling toll-free on the Baldwin Beach Express Bridge

As of noon today, motorists are traveling toll-free on the Baldwin Beach Express Bridge. This change comes after ALDOT acquired the bridge for $57 million. The toll removal is effective at noon on May 23, 2024.

The transition to a toll-free bridge aims to provide unrestricted access, facilitating easier and more efficient travel for all…

Read More “Baldwin Beach Express Bridge goes toll-free following ALDOT acquisition”

Governor Kay Ivey gave remarks and ceremonially signed paperwork accepting locally-owned roadway and right of way assets related to the state’s purchase of the Foley Beach Express toll bridge

Governor Kay Ivey today joined local officials in Baldwin County to sign paperwork that finalizes the state of Alabama’s purchase of the Foley Beach Express toll bridge.

The chairman of the Baldwin County Commission and the mayors of Foley, Gulf Shores and Orange Beach all joined Governor Ivey at Foley City Hall on the eve…

Read More “Governor Ivey signs paperwork finalizing state’s purchase of the Foley Beach Express Bridge, bridge to become toll free”

ALDOT's annual ROADeo event was held on May 15 in Montgomery

The annual Alabama Department of Transportation (ALDOT) state ROADeo was held May 15 in Montgomery. This competition puts ALDOT’s most skilled equipment operators to the test. These operators competed in various categories, showcasing their expertise in maneuvering large vehicles and equipment through challenging courses and demonstrating their ability to operate efficiently, precisely, and safely. ROADeo…

Read More “ALDOT statewide ROADeo winners advance to the Southeastern Regional Equipment ROADeo competition”

Beach Express toll plaza

The Alabama Department of Transportation today announced a temporary traffic control plan for the Baldwin Beach Express Bridge, effective at noon May 23, 2024, to ensure a smooth transition for motorists after the end of toll collections.

Temporary Traffic Plan Details:

Date of Implementation: Starting at noon on May 23, 2024. Traffic Flow: Traffic…Read More “ALDOT announces traffic plan for Beach Express Bridge post-toll removal”