Skip to content

ALDOT News Hub

Two lanes with One-Way Traffic Flow planned for Intracoastal Waterway Bridge by Memorial Day

The Alabama Department of Transportation (ALDOT) continues making progress on construction of the new Intracoastal Waterway Bridge in Baldwin County.

Motorists can expect an important milestone soon: the anticipated opening of two lanes of traffic with a one-way traffic flow across the new bridge on or before Memorial Day.

To help drivers prepare, ALDOT...

Read More "Two lanes with One-Way Traffic Flow planned for Intracoastal Waterway Bridge by Memorial Day"
Map of the widening on SR-225 in Spanish Fort

The Alabama Department of Transportation (ALDOT), in partnership with the City of Spanish Fort, will begin a roadway widening project on SR-225 from Oakridge Drive to General Canby Boulevard starting Monday, August 4, weather permitting.

This improvement is part of the Alabama Transportation Rehabilitation and Improvement Program (ATRIP), a statewide effort to enhance public roads…

Read More “SR-225 widening project to begin in Spanish Fort”

An Alabama Department of Transportation (ALDOT) resurfacing project on SR-223 in Pike County begins Monday, July 28, weather permitting.

The project will take place on SR-223 from US-29 to the Bullock County line.

This project includes resurfacing, shoulder widening and traffic stripe.    

Motorists should expect lane closures and reduced speed limits throughout the project….

Read More “SR-223 resurfacing project in Pike County begins next Monday”

Resurfacing of SR-133/Cox Creek Parkway will begin Sunday night. The project includes resurfacing through multiple intersections, including the intersection with Darby Drive.

Resurfacing of SR-133/Cox Creek Parkway in Florence will begin the evening of Sunday, July 27, weather permitting.

In the $1.4 million project, contractor Rogers Group will mill and resurface more than two miles of the corridor from US-72/Florence Boulevard to SR-17/Helton Drive.

Initial work will include milling at intersections, installing signal detection loops, and patching.

Read More “Resurfacing of SR-133/Cox Creek Parkway in Florence to start Sunday night”

ALDOT workers repair a damaged rail on the flyover bridge at I-65 and I-565.

ALDOT is making final repairs to the damaged flyover bridge at the I-65 and I-565 interchange today.

A steel coil fell from a truck Tuesday and damaged the bridge and ramp from I-565 westbound to I-65 southbound.

Yesterday, ALDOT crews milled and paved to repair the asphalt roadway of the ramp, then began preparations…

Read More “ALDOT making final repairs to damaged I-65 ramp bridge today”

Popular Stories