Skip to content
ALDOT News Hub

I-59/20 resurfacing between Fairfield Boulevard and Valley Road Bridges

I-59/20 resurfacing between Fairfield Blvd Bridge to Valley Road Bridge
Region/County East Central/Jefferson
Type of WorkFor constructing the micro-milling, resurfacing, guardrail installation, and traffic stripe on I-20/I-59 from a point south of the Fairfield Boulevard Bridge (MP 116.290) to a point south of the Valley Road Bridge (MP 118.277) in Fairfield. Length 1.985 mi
RouteI-59/20
Projected StartFebruary 2026
Projected CompletionSummer 2026
Project NumberIM-IMGR-I059(459)
Project Cost$1,503,935.95
Project StatusActive
Get the latest traffic information at algotraffic.com or on the ALGO Traffic app.