Skip to content
ALDOT News Hub

The left turn lanes on North Memorial Parkway (US-231/US-431) at Mastin Lake Road in Huntsville will be closed for the safety of the traveling public during initial stages of the overpass bridge construction. ALDOT anticipates the closure remaining in place for several months.

The closure of the northbound and southbound left turn lanes on the…

Read More “Left turns from Memorial Parkway to Mastin Lake Road to be closed for several months”

A Continuous Green T (CGT) intersection is a specialized traffic intersection design for three-way (T-shaped) intersections.

These intersections enhance safety and efficiency, allowing traffic on the main roadway to flow continuously through the intersection with a green light. This eliminates the need for stops and reduces overall delays facilitating free-flow movement.

The traffic signal…

Read More “Green T intersections enhance safety”

One of ASAP's Ford F-350s is suited with a J-Tech LaneBlade to help remove debris from the roadway.

The Alabama Department of Transportation (ALDOT) is looking to clear roadways and debris faster with its new J-Tech LaneBlade.

ALDOT’s Alabama Service Assistance Patrol Program (ASAP) has recently taken strides to achieve that goal by adding a J-Tech LaneBlade to the front of one of its Ford F-350s. 

The LaneBlade is a retractable device that…

Read More “ALDOT adds LaneBlade to ASAP truck”

The Huntsville Northern Bypass will intersect North Memorial Parkway (US-231/US-431) south of Bob Wade Lane.

The City of Huntsville today announced upcoming work to construct the Northern Bypass that will impact traffic on North Memorial Parkway (US-231/US-431).

According to the city’s statement:

“Weather permitting, single-lane closures northbound on North Memorial Parkway near Bob Wade Lane will begin Monday, Nov. 18, at 9 a.m. as part of the Huntsville Northern Bypass…

Read More “North Memorial Parkway lane closures planned for Northern Bypass construction”

On Wednesday, traffic on North Memorial Parkway (US-231/US-431) will move to the service roads at Mastin Lake Road in Huntsville to accommodate overpass construction.

Updated timeline: Switch to North Memorial Parkway service roads postponed

Traffic will move from the North Memorial Parkway (US-231/US-431) mainline to the newly constructed service roads near Mastin Lake Road in Huntsville next week, if weather permits.

Rogers Group, the contractor on the $34 million project, plans to begin shifting both northbound and southbound traffic…

Read More “Traffic to move to new North Memorial Parkway service roads”

Uprights for the overhead sign structures that will support the message boards on I-565 westbound between County Line Road and Greenbrier Road.

Updated timeline: I-565 overhead message board schedule changes

Motorists will soon benefit from travel information displayed on overhead message boards on I-565 in Limestone and Madison counties.

A contractor will install the dynamic message signs (DMS) at three locations as part of the ongoing $5.2 million advanced corridor management project. The project, which began in…

Read More “Overhead message boards coming to I-565”

Work continues on the interchange bridges over I-565 at Town Madison

Expect some travel delays overnight on I-565 westbound near the Town Madison Interchange (Exit 10) in Madison County.

Weather permitting, contractors will install striping and transition travel lanes to their final positions. Lanes were previously shifted to accommodate construction of the westbound off- and on-ramps and flyover bridges.

The work will take place from 7…

Read More “Lane closures set for tonight at I-565 Town Madison Interchange”