Skip to content
ALDOT News Hub
Expect the traffic pattern on US-72/Florence Boulevard to change as the contractor shifts traffic to the outside lanes, including the new additional lanes constructed by the $24 million project.

Expect nighttime delays and brief stoppages on US-72/Florence Boulevard as traffic patterns change for the next phase of the $24 million widening project in Lauderdale County.

The contractor will shift traffic to the outside lanes, including the new additional lanes, tonight and Thursday night, Aug. 21.

Barrier installation

Following the traffic shift, the contractor will…

Read More “Traffic patterns change on US-72/Florence Boulevard”

The contractor has begun work on the roadway approaching the bridge on Parker Road.

Expect single-lane nighttime closures next week on I-65 at Parker Road in Hartselle and Upper River Road in Priceville for bridge work and removal of traffic control.

Rogers Group plans to close the outside northbound lane at Parker Road about 6 p.m. Sunday, Aug. 17, for minor repairs to two bridge girders. The lane will…

Read More “Expect overnight I-65 lane closures for bridge work next week”

Workers pour concrete to form the deck of the new SR-247 bridge over Little Bear Creek in Franklin County.

The new SR-247 bridge over Little Bear Creek northeast of Red Bay in Franklin County continues to take shape.

Contractor Riley Bridge Company will pour concrete today to form the final section of the bridge deck.

Riley Bridge Company poured concrete for the next-to-last section of the bridge deck Tuesday. Weather permitting, they will pour…Read More “SR-247 bridge over Little Bear Creek taking shape”

Upper River Road in Priceville is open, following work to repair and raise the bridge over I-65 and build up the road approaching the bridge.

The bridge on Upper River Road over I-65 in Priceville is now open to traffic. The bridge closed in late June for repairs and raising.

Contractors repaired damage to the bridge girders that occurred in April when a piece of equipment struck the overpass. They then raised the bridge 13 inches to improve clearance.

The…

Read More “Upper River Road over I-65 reopens to traffic”

The way to school shouldn’t be in harm’s way. Stop for school buses, every time.

As summer winds down and students from kindergarten to college return to campuses, the Alabama Department of Transportation (ALDOT) reminds drivers to drive safely as school begins.

Motorists should stay alert, drive responsibly and slow down. With that in mind, drivers should expect heavier traffic and more pedestrian activity statewide.

As a result, drivers…

Read More “ALDOT reminds drivers to drive safely as school begins”

At the Alabama Department of Transportation, signal shops play a crucial role in ensuring the smooth operation of state-maintained intersections. Crews are responsible for installing and maintaining traffic signals across Alabama’s roadways. Crews place each signal for a reason, often based on traffic volume, and carefully calibrate its timing to match posted speed limits and…

Read More “Timing is everything: Inside ALDOT’s signal operations”

Signals positioned under the overpass govern the left turn lanes from North Memorial Parkway to Mastin Lake Road.

The left turn lanes from the US-231/US-431/North Memorial Parkway service roads to Mastin Lake Road reopened today.

The northbound and southbound turn lanes closed in December for construction of the parkway overpass at Mastin Lake Road.

The future North Memorial Parkway mainline north of Mastin Lake Road is almost ready for paving. Left turn…Read More “Left turn lanes from North Memorial Parkway to Mastin Lake Road reopen”

Resurfacing of SR-133/Cox Creek Parkway will begin Sunday night. The project includes resurfacing through multiple intersections, including the intersection with Darby Drive.

Resurfacing of SR-133/Cox Creek Parkway in Florence will begin the evening of Sunday, July 27, weather permitting.

In the $1.4 million project, contractor Rogers Group will mill and resurface more than two miles of the corridor from US-72/Florence Boulevard to SR-17/Helton Drive.

Initial work will include milling at intersections, installing signal detection loops, and patching.

Read More “Resurfacing of SR-133/Cox Creek Parkway in Florence to start Sunday night”

ALDOT workers repair a damaged rail on the flyover bridge at I-65 and I-565.

ALDOT is making final repairs to the damaged flyover bridge at the I-65 and I-565 interchange today.

A steel coil fell from a truck Tuesday and damaged the bridge and ramp from I-565 westbound to I-65 southbound.

Yesterday, ALDOT crews milled and paved to repair the asphalt roadway of the ramp, then began preparations…

Read More “ALDOT making final repairs to damaged I-65 ramp bridge today”

Contractors raised the Upper River Road bridge over I-65 by jacking it and inserting metal shims, which will be encased in concrete.

The Parker Road bridge over I-65 near Hartselle is scheduled to close Thursday, July 24, at noon as part of a project to raise the bridge structure.

Crews will elevate the bridge 13 inches to achieve a 17-foot clearance over I-65. The closure is expected to last about six weeks, and motorists should use alternate…

Read More “Parker Road bridge over I-65 to close Thursday at noon”